Barrick


Barrick Gold reports substantially improved cost performance and extended mine life after appointment of Barminco.

  • Top 3 world gold miner, typically owner operator
  • Kanowna Belle, 100,000t/mth West Australian gold mine at depths to 1200 m below surface
  • Development rate achieved of 310m/mth from 3 jumbos (120m/jumbo inclusive of paste development) impacting on mine ore production capacity
  • Access development rate required 400m/mth using mesh and bolts
  • Barminco commissioned March 2009 to take over all mine development activities
  • 400m/mth performance from 2 jumbos attained, inclusive of rehabilitation of stope brows and ore drives
  • Mine owner reported substantially reduced unit development costs and increased mine life due to faster and cheaper development  