Shotcrete improves development productivity


Shotcrete implementation in a deep gold mine increases development productivity and reduces costs.

  • 1.2Mtpa West Australian gold mine at depths to 1300 metres below surface.
  • Access development rate required of 350m/mth
  • Mesh regularly damaged by loaders
  • Seismicity/ ground stress required ongoing rehabilitation of previously developed areas
  • Restricted jumbo capacity meant that three jumbos were insufficient to meet development requirement
  • Fibre reinforced shotcrete introduced
  • Development rate increased from 142 to 372m/jumbo, eliminating need for two of the three jumbos
  • Rehabilitation eliminated (life of mine support achieved)
  • Significant reduction in the maintenance cost of the one remaining jumbo
  • Shotcreting and Development Mining